Landfill Leachate

bioFLOW™ MBR - Removes More Than 90% Influent Parameters for Permit Compliance
Project Information
Industry
Landfill
Project
bioFLOW MBR System for New England Landfill
Application
Biochemical Oxygen Demand (BOD) Removal | Total Suspended Solids (TSS) Removal | Nitrification of Ammonia
289,300
GPD
>99%
BOD Removed
>99%
Ammonia-N removed

Project Summary

A New England landfill needed to upgrade its leachate treatment to meet its discharge permit. A bioFLOW MBR system now treats 289,300 GPD of leachate, with reverse osmosis downstream.

Influent and Effluent Data

ParameterInfluentEffluent
Wastewater Flow289,300 GPD/
BOD2,093 mg/L<20 mg/L
TSS660 mg/L<10 mg/L
NH4-N1,483 mg/L<5 mg/L
FOG42 mg/L<10 mg/L

The Problem

The Landfill needed to upgrade their wastewater treatment system to meet the permitted discharge requirements.

Rows of horizontal membrane modules and pipework in a landfill leachate treatment system.

The Solution

bioprocessH2O supplied a fully integrated and highly automated bioFLOW MBR System to meet the Local Industrial Discharge Permit requirements.

The Results

The bioFLOW MBR System removes >98% of the influent parameters listed in the table above. The MBR Biological treatment plant provides a robust biological treatment process and effective membrane performance. The bioFLOW MBR System generates a high quality UF permeate that also feeds a RO system for desalination and TOC removal prior to effluent discharge at ≤0.2 NTU and ≤3 SDI.

MBR followed by reverse osmosis is also the starting point for treating PFAS in leachate. See PFAS treatment for landfill leachate and our landfill leachate treatment systems.

Water treatment equipment with blue pressure vessels, piping, and a control panel.
24/7 availability for critical support