WASTEWATER CASE STUDIES

Filter through our Past Projects by Industry below
Letterkenny Army Depot

Letterkenny Army Depot

bioFAS™ MBBR - Effectively Removed 90+% of BOD While Handling Variable Flows & Loads

U.S. Land Port Entry

U.S. Land Port Entry

bioPULSE™ MBR - BOD, TSS & TKN Levels Reduced to Meet Discharge Requirements

Yasgur Campground

Yasgur Campground

Custom Control Panels Allowed Woodstock Reunion Concert To Proceed

 
 

Call (401) 683-5400 or Toll Free (866) 882-5400

Click Contact Us to speak with a design engineer. 

Your cart