DECENTRALIZED CASE STUDIES

Filter through our Past Projects by Industry below
Grand Bahama Shipyard

Grand Bahama Shipyard

bioFAS™ IFAS - Increased Flow Rate and Plant Expansion from 86,000 GPD to 264,000 GPD

Marshfield High School

Marshfield High School

bioTRIPURE Ultrafiltration System - TSS & Turbidity Levels Reduced to Meet High School's Discharge Permits

Pine Brook CC

Pine Brook Country Club

bioFASTM (IFAS) Equipment Package that allows for below grade installation providing good esthetics as the system was installed adjacent to the golf course

 
 

Call (401) 683-5400 or Toll Free (866) 882-5400

Click Contact Us to speak with a design engineer. 

Your cart