Compliance Issues Resolved - BOD Reduced >90%

How we fixed compliance issues for this dairy farm.

A guide to fixing water compliance issues for the dairy industry.

Project: bioFAS MBBR & DAF System for Dairy Production

Industry: Food Production & Packaging

Application: Biochemical Oxygen Demand (BOD) & Total Suspended Solids (TSS)

Application Parameters:

Application Parameters

The Problem:  The existing DAF was not providing adequate pretreatment prior to discharge to the local municipality. To stay in compliance with discharge permits for soluble BOD and TSS, installation of new DAF units and biological treatment system were required.

The Solution:  bioprocessH2O supplied two DAF units and a single stage bioFAS™ MBBR biological treatment process to reduce BOD at varying flow and organic loading rates.

Status/Results: The bioFAS™ MBBR System effectively removes BOD by >90% and easily meets the discharge permit requirements. The system is able to operate with minimal operator attention and oversight. Additional details can be provided by bioprocessH2O.

View Other System Case Studies

by Tim Burns

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Sample CAption here
Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Connect with Our Expert Engineers Today and Find Solutions for Your Wastewater Challenges